Skip to content
Sealed containment on every removal Open 24/7 (914) 228-9410
Asbestos Removal Mount Vernon logo

For Bronx and other city properties

ACP-5 Filing for Mount Vernon Owners With Bronx and City Projects

When the renovation is across the line in New York City, get the asbestos survey and signed assessment report the permit application depends on.

Clipboard and pencil on a wooden desk

Where the ACP-5 Applies, and Where It Does Not

Mount Vernon is a separate city in Westchester County, and asbestos jobs within its borders answer to the state's Industrial Code Rule 56 with no ACP-5 in the picture. A few blocks south, though, the Bronx begins, and plenty of Mount Vernon owners, landlords and contractors have buildings or jobs on that side of the line. Once you cross into city territory, DEP layers its own asbestos program over the state requirements. Before the Department of Buildings will issue most permits, a DEP-certified asbestos investigator has to survey the area the work will disturb and sign an Asbestos Assessment Report, the ACP-5, stating that no regulated asbestos will be affected. Should the survey find asbestos in the path of the work, that material is abated under its own notification before the permitted job can go forward. We handle the survey, the signed report and any abatement it triggers, so the permit does not sit waiting on asbestos paperwork.

What ACP-5 Work Includes

From the first survey to a filed report, plus abatement if the survey finds something.

  • Survey of the affected area

    A DEP-certified investigator inspects every space the project will disturb.

  • Sampling and lab analysis

    Anything doubtful cut and sent for laboratory analysis.

  • The signed assessment report

    An ACP-5 prepared and signed by the certified investigator.

  • Filing with the permit

    The report filed so it supports the Department of Buildings application.

  • Abatement when required

    Removal under a project notification before permitted work begins.

  • Your architect and expediter looped in

    Dates and documents shared so the permit package stays consistent.

How the ACP-5 Gets Done

  1. Project details

    The building, the borough, the scope of work and where the permit application stands.

  2. Survey and samples

    The investigator inspects the area and samples anything suspect.

  3. File or abate

    If no regulated asbestos will be disturbed, the ACP-5 is filed; if it will be, abatement comes first.

Why Owners North of the Line Use Us

  • Survey and removal from one company

    If asbestos turns up, the same crew abates it, with no second contractor to hire.

  • Clear on which rules apply

    We tell you plainly whether your project falls under city filing requirements.

  • Status you can follow

    You know where the survey, lab results and filing stand at each point.

  • DEP-certified investigators
  • Accredited lab analysis
  • Report filed for you
  • Abatement if needed

Waiting on an ACP-5 for a City Permit?

Tell us where the property is and what the work involves, and we will explain what the filing will take.